To find a custom solution to load and transport the complete fabricated vessel from vendor yard to port.
Solution provided
Hydraulic multi axle trailers were used for this operation. 2 files of 15 axle conventional trailers with 540 HP ballested truck were used to load the cargo by using the self jacking system of the trailers. This also helped with the narrow roads and other obstacles.
Top and tailing of flanging machine in confined space
Project scope
The whole operation has to be carried out inside a warehouse with a headroom of 12.9m. The lifting equipment had to be assembled 7m away from the installation location(foundation).
Solution provided
As per the site inspection, crane option was ruled out thus using SBL900 gantry system with max. capacity of 900T(225.0t cap/ram) and a reach of up to 11.3m to execute the job. Initially the flanging machine was rotated 90 degrees using a turn table. Top of tail of the machine was completed using the gantry system. The gantry along with the flanging machine was moved near the foundation and as per the clients requirement the machine was aligned and installed over the foundation.