[email protected] 800 272637
Back To Media
Lifting of HP heater (HP8)

Weight: 126T

Project scope

To lift the HP heater (length: 9.4m, height: 3m, width: 3.2m) and erect it on the foundation (height: 21.5m)

Solution provided

Our Liebherr LR 11000 (1000T crawler crane) with SDWB2 48m Main boom & 66 luffer configuration was used as the main crane to successfully lift the HP heater and carefully position it on the installing foundation.