Transportation of transformers

Weight: 95T

Project scope

To transport the transformer (length: 8.5m, width: 3.5m, height: 3.5m) from
JAFZA port to DIP storage area. Our major challenge was the storage handling for these transformers.

Solution provided

After examining all the sites and route conditions, a selection of 2 files of 8 axle hydraulic trailer was made to execute the project. The offloading was done onto stools and beams. These certified heavy duty stools and beams have been made in-house and customised by us for our client.